Adaptive tools for complex projects: PMBOK® 6, 7 and 8 versus AACE
Read uncertainty, adjust time and sustain value: a comparison of PMBOK® 6, 7 and 8 with AACE Recommended Practices. With a downloadable white paper.
Read article →Technical articles on Primavera P6, MS Project, EVM, BIM 4D and construction management, written by engineers who work in the field.
Read uncertainty, adjust time and sustain value: a comparison of PMBOK® 6, 7 and 8 with AACE Recommended Practices. With a downloadable white paper.
Read article →What each of the 14 points of the DCMA assessment measures, the published thresholds, why they fail on real projects and how to fix them in Primavera P6 or MS Project.
Read article →A practical guide to moving schedules from Primavera P6 to MS Project and back: what is preserved, what is lost (calendars, lags, WBS, LOE) and how to verify the result in 10 minutes.
Read article →Migrating between scheduling platforms is one of the biggest headaches for planners. In this article we explain the exact steps, what is preserved and what you need to review manually.
Read article →The S-Curve is the most powerful tool for controlling a project's progress. We explain how to build it from scratch, how to read it and how to use it to make decisions before it is too late.
Read article →Linking the 3D model with time turns the schedule into something everyone understands, from the field engineer to the board. Here we show you the complete process.
Read article →Earned Value Management sounds complicated until you see it applied to a real project. In this article we use the example of constructing a building to explain each indicator.
Read article →The Look-Ahead is the bridge between the master schedule and the work week. We explain how to implement it, what information to capture and how to use it in site meetings.
Read article →Our courses take all of this to a practical level, with your data, your project and your team.